PlannedWalk / quality 6
Low-friction evening walk
Downshift after the build block before dinner.
Q3 / July - September 2026
Recovery
Schedule rest with the same seriousness as output: sleep windows, walks, mobility, stillness, and deloads that keep the system alive.
planned
0
done
0
skipped
0
quality
-
5 July
Protect one recovery block before the day takes it.
Create
History
Downshift after the build block before dinner.
Screens off before the window. Tomorrow should not start tired.
Good release after long sitting.